Electrical transmission and substation structures 2012 : solutions of building the grid of tomorrow : proceedings of the 2012 Electrical Transmission and Substation Structures Conference, November 4-8, 2012, Columbus, Ohio
Abstract
This paper will present the approach that TVA employed to optimize engineering solutions to stretch available supplies as far as possible and that also prioritized equipment and construction personnel to return the transmission system back to service.
Collections
- Technology [3030]