Please use this identifier to cite or link to this item:
https://lib.hpu.edu.vn/handle/123456789/21339
Title: | Electrical transmission and substation structures 2012 : solutions of building the grid of tomorrow : proceedings of the 2012 Electrical Transmission and Substation Structures Conference, November 4-8, 2012, Columbus, Ohio |
Authors: | Pugh, Archie D |
Keywords: | Electrical transmission Grid Substation structures Conference |
Issue Date: | 2013 |
Publisher: | The American Society of Civil Engineers |
Abstract: | This paper will present the approach that TVA employed to optimize engineering solutions to stretch available supplies as far as possible and that also prioritized equipment and construction personnel to return the transmission system back to service. |
URI: | https://lib.hpu.edu.vn/handle/123456789/21339 |
ISBN: | 978-0-7844-1265-7 |
Appears in Collections: | Technology |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
30_Electrical_transmission_and_substation_structures_2012.pdf Restricted Access | 18.86 MB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.