Please use this identifier to cite or link to this item: https://lib.hpu.edu.vn/handle/123456789/21339
Full metadata record
DC FieldValueLanguage
dc.contributor.editorPugh, Archie Den_US
dc.date.accessioned2016-06-13T03:06:58Z
dc.date.available2016-06-13T03:06:58Z
dc.date.issued2013en_US
dc.identifier.isbn978-0-7844-1265-7en_US
dc.identifier.otherHPU2160030en_US
dc.identifier.urihttps://lib.hpu.edu.vn/handle/123456789/21339-
dc.description.abstractThis paper will present the approach that TVA employed to optimize engineering solutions to stretch available supplies as far as possible and that also prioritized equipment and construction personnel to return the transmission system back to service.en_US
dc.format.extent448 p.en_US
dc.format.mimetypeapplication/pdf-
dc.language.isoenen_US
dc.publisherThe American Society of Civil Engineersen_US
dc.subjectElectrical transmissionen_US
dc.subjectGriden_US
dc.subjectSubstation structuresen_US
dc.subjectConferenceen_US
dc.titleElectrical transmission and substation structures 2012 : solutions of building the grid of tomorrow : proceedings of the 2012 Electrical Transmission and Substation Structures Conference, November 4-8, 2012, Columbus, Ohioen_US
dc.typeBooken_US
dc.size18.4 MBen_US
dc.departmentEnglish resourcesen_US
Appears in Collections:Technology

Files in This Item:
File Description SizeFormat 
30_Electrical_transmission_and_substation_structures_2012.pdf
  Restricted Access
18.86 MBAdobe PDFThumbnail
View/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.